INFE GROUP
        

PROJECTS


GUARDIA CIVIL PATROL BOATS


INFE GROUP
We carried out thermal insulation works on the generators’ exhaust lines using high temperature insulating mattresses.
Soundproofing works of the yacht’s electrical generators were carried out.

Renewal of the exhaust system on both main engines. Sea valves maintenance and various works requested by the maritime service were carried out. A ventilation hatch was installed in the bridge area.


YATE 18 M


INFE GROUP
We carried out thermal insulation works on the generators’ exhaust lines using high temperature insulating mattresses.

Refrigeration piping repairs. – Cooling pipes repair Sea valves inspection. Maintenance of the propellers’ shafts.


SAILING YACHT 37 M


INFE GROUP
We carried out thermal insulation works on the main engines’ exhaust lines using high temperature insulating mattresses.
We also carried out fire protection works on bulkheads using fireproof thermal insulation materials.




SAILING YACHT 37 M


INFE GROUP
We also carried out fire protection works on bulkheads using fireproof thermal insulation materials.
We also carried out thermal insulation works using Armaflex to avoid condensation on ceilings and bulkheads.




SAILING YACHT 39 M


INFE GROUP
We carried out thermal insulation works on the main engine’s exhaust lines using high temperature insulating mattresses.
We also carried out thermal insulation works on the electrical generators’ exhaust lines using high temperature insulating mattresses.




SAILING YACHT 49 M


INFE GROUP
We carried out the installation of white perforated aluminium sheeting on bulkheads and ceiling in the engine room.
We also carried out thermal insulation works on the main engine’s and electrical generator’s exhaust lines using high temperature insulating mattresses.




SAILING YACHT 58 M


INFE GROUP
We carried out the installation of white perforated aluminium sheeting on bulkheads in the engine room.
We also carried out fire protection works on bulkheads and ceiling using fireproof thermal insulation materials.

Replacement of the seals on the propeller. - Replacement of the seals on the bow thruster.


EXPEDITION YACHT 49 M


INFE GROUP
We carried out thermal insulation works on the main engines’ and electrical generators’ exhaust lines using high temperature insulating mattresses.

Main engine’s extraction maneuverto be able to carry out an inspection. A previous assembly of a reinforced structural perimeter had to be carried to be able to lift and evacuate the main engine. Various maintenance works on pumps, pipes and valves were carried out.


CRUISE 108 M


INFE GROUP
We carried out thermal insulation works on the main engines’ turbos using high temperature insulating mattresses.




CRUISE 194 M


INFE GROUP
We carried out thermal insulation works on the main engines’ exhaust lines using high temperature insulating mattresses.
We also carried out fire protection works on bulkheads using fireproof thermal insulation materials.




En cumplimiento de la Ley 34/2002, de fecha 11 de julio, de servicios de la sociedad de la información y del comercio electrónico, INFE GROUP,
informa a sus usuarios de la utilización de cookies analíticas para mejorar el servicio prestado.